石積み前の準備作業とは何ですか

  1. 初め, 設計図はほぼ完成している; 装飾設計図は包括的かつ包括的な設計図です。; すべての装飾材料と建設計画を含む, 品種, スタイル, 素材の相互協力と石材は密接な関係にあります。. We must first check Whether the drawings related to stone are complete before starting lofting;
  2. The civil work (including internal partition walls) has been completed; during the interior decoration process, there are often civil work modifications and additions, which must be completed in advance before setting out;
  3. Level water and elevation have been determined; level water is the benchmark for measurement on the construction site, which must be completed first, especially for stairs to measure the floor height, the data must be as accurate as possible, and the calculation needs to be based on the level water line of the two floors. There will be a significant gap between the design elevation and the size of the civil works, and whether the elevation is appropriate needs to be verified on site.
  4. The position of the door and window frame is determined; the civil construction of doors and windows is generally not standard, and the size and position are mostly modified during the decoration design process. The model, specification and position of the door and window must be determined before the stone lofting.
  5. The bathroom is waterproofed and the finished surface is determined;
  6. The stone installation plan should be clear; the dry hanging method and wet paste of the stone on the wall determine the size of the finished surface, as well as the boundary line of the finished surface on the ground; the finished surface after the stone installation can be released according to the civil engineering foundation and the construction sample .