What are the preparatory work before stone lofting

  1. Primo, the design drawings are basically finalized; the decorative design drawings are comprehensive and comprehensive design drawings; including all decorative materials and construction plans, the varieties, styles, and mutual cooperation of materials are closely related to stone materials. We must first check Whether the drawings related to stone are complete before starting lofting;
  2. The civil work (including internal partition walls) has been completed; during the interior decoration process, there are often civil work modifications and additions, which must be completed in advance before setting out;
  3. Level water and elevation have been determined; level water is the benchmark for measurement on the construction site, which must be completed first, especially for stairs to measure the floor height, the data must be as accurate as possible, and the calculation needs to be based on the level water line of the two floors. There will be a significant gap between the design elevation and the size of the civil works, and whether the elevation is appropriate needs to be verified on site.
  4. The position of the door and window frame is determined; the civil construction of doors and windows is generally not standard, and the size and position are mostly modified during the decoration design process. The model, specification and position of the door and window must be determined before the stone lofting.
  5. The bathroom is waterproofed and the finished surface is determined;
  6. The stone installation plan should be clear; the dry hanging method and wet paste of the stone on the wall determine the size of the finished surface, as well as the boundary line of the finished surface on the ground; the finished surface after the stone installation can be released according to the civil engineering foundation and the construction sample .